Planning and Construction Phases

Phase - 2

The structure’s walls are inserted into the U-shaped metal receptacles, as detailed in the approved production specifications. In many projects, the walls are assembled on the ground and lifted into place with a crane. In small single-story buildings, the walls can be assembled manually, one cassette at a time, cheaply, very fast, and without using a crane.

 

 